Installation & Commissioning
Our factory-trained engineers provide complete installation, commissioning, and operator handover services for your recycling equipment. We ensure your system is optimized for peak performance on day one.
Commissioning Modules
From site preparation to full operational readiness, our comprehensive commissioning approach covers every phase of equipment deployment.
Site survey, foundation requirements, utility connections, layout optimization, and logistics coordination before equipment arrives.
Professional assembly, alignment, and connection of all machine components, conveyors, piping, and structural supports.
Wiring, PLC programming, VFD configuration, sensor calibration, and integration with existing plant control systems.
Systematic start-up, parameter adjustment, and performance verification against agreed output specifications.
Comprehensive on-site training covering daily operation, safety procedures, basic maintenance, and troubleshooting for customer personnel.
Complete handover documentation including as-built drawings, operating manuals, maintenance schedules, and warranty registration.
Commissioning Process
A structured five-stage approach ensures systematic verification and operator readiness.
Project Kick-off & Site Preparation
Confirm installation schedule, utility readiness, civil works completion, and logistics for equipment delivery.
Mechanical & Electrical Installation
Assemble equipment, connect utilities, wire control panels, and verify all mechanical alignments.
Dry Run & Safety Verification
Test all drives, interlocks, emergency stops, and control sequences without material to verify safe operation.
Wet Commissioning with Material
Run production material through the system, adjust parameters, and verify output quality, throughput, and temperature.
Performance Acceptance & Handover
Confirm all specifications are met, train operators, deliver documentation, and activate warranty.
Commissioning FAQs
How long does commissioning typically take?
Depends on system complexity: standalone machines require 2-3 days, complete washing or pelletizing lines typically take 1-2 weeks including operator training.
Do your engineers travel internationally?
Yes. Rumtoo factory-trained engineers provide installation and commissioning services worldwide.
What site preparation is needed before your team arrives?
Foundation, utility connections (power, water, compressed air), and adequate space for equipment staging. Rumtoo provides a pre-installation checklist.
Is operator training included in commissioning?
Yes. Every commissioning includes hands-on operator training covering operation, safety, daily maintenance, and basic troubleshooting.
Planning an Installation?
Share your project timeline and equipment requirements with our engineering team to receive a customized commissioning plan.