Installation & Commissioning

Our factory-trained engineers provide complete installation, commissioning, and operator handover services for your recycling equipment. We ensure your system is optimized for peak performance on day one.

Engineers commissioning industrial recycling equipment on customer site

Commissioning Modules

From site preparation to full operational readiness, our comprehensive commissioning approach covers every phase of equipment deployment.

Pre-Installation Planning

Site survey, foundation requirements, utility connections, layout optimization, and logistics coordination before equipment arrives.

Mechanical Installation

Professional assembly, alignment, and connection of all machine components, conveyors, piping, and structural supports.

Electrical & Control Integration

Wiring, PLC programming, VFD configuration, sensor calibration, and integration with existing plant control systems.

Commissioning & Performance Testing

Systematic start-up, parameter adjustment, and performance verification against agreed output specifications.

Operator Training & Handover

Comprehensive on-site training covering daily operation, safety procedures, basic maintenance, and troubleshooting for customer personnel.

Documentation & Warranty Activation

Complete handover documentation including as-built drawings, operating manuals, maintenance schedules, and warranty registration.

Commissioning Process

A structured five-stage approach ensures systematic verification and operator readiness.

1

Project Kick-off & Site Preparation

Confirm installation schedule, utility readiness, civil works completion, and logistics for equipment delivery.

2

Mechanical & Electrical Installation

Assemble equipment, connect utilities, wire control panels, and verify all mechanical alignments.

3

Dry Run & Safety Verification

Test all drives, interlocks, emergency stops, and control sequences without material to verify safe operation.

4

Wet Commissioning with Material

Run production material through the system, adjust parameters, and verify output quality, throughput, and temperature.

5

Performance Acceptance & Handover

Confirm all specifications are met, train operators, deliver documentation, and activate warranty.

Installation and commissioning process

Commissioning FAQs

How long does commissioning typically take?

Depends on system complexity: standalone machines require 2-3 days, complete washing or pelletizing lines typically take 1-2 weeks including operator training.

Do your engineers travel internationally?

Yes. Rumtoo factory-trained engineers provide installation and commissioning services worldwide.

What site preparation is needed before your team arrives?

Foundation, utility connections (power, water, compressed air), and adequate space for equipment staging. Rumtoo provides a pre-installation checklist.

Is operator training included in commissioning?

Yes. Every commissioning includes hands-on operator training covering operation, safety, daily maintenance, and basic troubleshooting.